Skip to main content

Use Case · Infrastructure Modernisation

From legacy racks to AI-ready estate.

Refit aging facilities into AI factories without ripping out what works. Yobitel engineers retrofit cooling, fabric, and orchestration around your existing footprint — then layer GitOps and platform tooling so the new estate runs itself.

-40%

Five-year TCO vs cloud burst

2×

Rack density via DLC

1.15

Achievable PUE

< 90 days

First GPU pod live

Why teams struggle

The problems that block the work.

We hear the same pattern of failure modes across every engagement. These are the ones Yobitel exists to remove. Not generic platitudes, but the specific frictions that stall delivery.

01

Aging compute, no AI headroom

10-year-old E5 Xeons, 1.5 kW per rack air cooling, no spare PCIe lanes. The estate runs the ERP fine but cannot host a single H100 node, let alone an NVL72.

02

Network bottlenecks

25 GbE ToR fabric and oversubscribed leaf-spine. All-reduce traffic on a training job saturates the spine within seconds and starves every other workload.

03

No automation, manual everything

Provisioning a new VLAN takes a week. Patch windows are coordinated by email. There's no GitOps, no IaC, no immutable infra — only a wiki page someone keeps editing.

04

Energy cost and ESG pressure

PUE sits above 1.8, audit committee wants a path to 1.2, and the operator can't host a single 70 kW rack of GPUs without exceeding the facility envelope.

What Yobitel delivers

The capabilities we ship, end to end.

Each capability is a first-class product surface, not a slide. They compose into the platform behind every Yobitel customer in production.

GPU cluster engineering

Reference architectures for 8-way H100/H200 HGX, B200 NVL72, MI300X, and Jetson edge nodes. We size, procure, install, and benchmark to spec.

InfiniBand & RoCE fabric

Non-blocking 400/800 GbE Spectrum-X or NDR InfiniBand spines. Adaptive routing, congestion control, and GPUDirect RDMA tuned for collective ops.

Direct liquid cooling retrofit

Rear-door heat exchangers, in-row CDU, and direct-to-chip cold-plate loops. We design CFD-modelled airflow and integrate with existing chillers.

Kubernetes adoption

Vanilla upstream K8s with the NVIDIA GPU Operator, Spectrum-X CNI, and storage classes for NVMe-oF, CephFS, and S3-compatible object stores.

GitOps everywhere

Argo CD on every cluster, Crossplane for infra, Renovate for image hygiene, OPA for policy. The wiki page becomes a Git repo with PR reviews and audit.

Power & PUE optimisation

Smart PDUs, DCIM integration, and workload-aware power capping. We commission to a target PUE and certify it with a third-party audit.

Structured cabling & FTTH

OS2 single-mode trunks, MPO-24 patching, and FTTH between halls. Documented in a live source-of-truth that survives the install crew leaving.

Sovereign-by-design

UK G-Cloud, NCSC CAF, EU DORA, and India MeitY frameworks engineered in from day one — not retrofitted at audit time.

How adoption unfolds

From pilot to production, step by step.

The typical adoption path. We compress it where you have momentum and we slow it down where compliance or change-control demand it.

01

Audit & target architecture

Two-week assessment of power, cooling, fabric, racks, and software. We deliver a target architecture with phased migration plan and TCO model.

02

Retrofit cooling & fabric

Install DLC loops, upgrade ToR/spine to InfiniBand or Spectrum-X, run new OS2 trunks. Hot-cutover sequencing minimises downtime.

03

Land first GPU pod

Deploy a reference 8-node H200 or NVL72 pod, validate NCCL throughput, MIG slices, GPUDirect, and tenant isolation.

04

Adopt the platform layer

Stand up K8s, Argo CD, GPU operator, storage, monitoring, and Yobibyte. Migrate the first workload behind the new control plane.

05

Operate & expand

24×7 Yobitel managed ops or transfer to your SRE team. Roll the pattern out to remaining halls and edge sites.

Outcomes we measure

The numbers customers report back to us.

Aggregated medians across recent deployments. Specific outcomes depend on workload and starting baseline. We'll model yours during the first conversation.

40%

Lower five-year TCO vs equivalent cloud burst

2×

Rack density unlocked by direct liquid cooling

1.15

Achievable PUE on a refitted Tier III hall

90 days

From audit to first AI workload in production

Customer story

UK regional cloud operator, 4 MW campus

Converted three legacy halls into a 6-rack NVL72 zone with PUE 1.18 — without taking customer workloads offline.

Yobitel ran cooling, fabric, and platform in parallel. We stayed in lockstep with our DC operations team the whole way.

Where this lands

  • 40%

    Lower five-year TCO vs equivalent cloud burst

  • 2×

    Rack density unlocked by direct liquid cooling

  • 1.15

    Achievable PUE on a refitted Tier III hall

Read more case studies

Ready to put this into production?

Talk to a Yobitel engineer. We'll map your environment, sketch the architecture, and propose a 60–90 day plan to first measurable outcome.